28th Apr 2013

This bottom right two blocks on this wall had unfortunately dropped a little due whilst the opening down stairs was enlarged where the old back door was. The steel lintel is in place now, has all been bedded down and this wall has been made good. It isn't supporting anything significant above due to the lintels that are already in place above it. However it is good that it has been bricked up and sorted out now. One less thing to worry about.


The area above will eventually be a cupboard with a wall facing the master bedroom with built in shelves for books and a TV. Access to the cupboard will be from the landing with a single door, within the cupboard we are planning on having a small radiator with a thermostatic valve so that we still have a warm area of storage now that the hot water tank has gone.


The first fitment of the shower tray and toilet in the new en-suite has been started by the plumber. Only the toilet is operational at the moment, the rest to be completed later.


The LED down lights have been installed in the office and the bedroom, along with most of the sockets and data points.


The sockets on the wall are for a future planned TV mounting, again data points as most TV's these days have an Ethernet network port on them for streaming and on demand services.