The plasters have now done the en-suite, the office and the bedroom. It is still drying out in places so not ready for painting yet.
In the photo above, we have opted to make a feature and use the old window opening and use the space for some built in shelves next to the sink. It has always bugged me when there isn't a level surface somewhere near a shaver socket to put a toothbrush or shaver on whilst charging. We will have one next to the bottom shelf so we won't have to charge things whilst dangling in mid air.
Office is still a store room, but has now been plastered and is drying out well as it catches the sun through the large window.
The new bedroom has also been plastered. and the mains sockets have been installed.