2nd Mar 2013

The stud wall is now in place between the office and the back bedroom along with the first fix electrical and data cables. The plywood is showing some staining where it has got wet along with everything else on this project, it has been treated though to kill off any bugs or mold that may be lingering.


The Floor has also been installed now which should be nice and warm with the heating directly below it.

The wall from the other room shows the number of cables installed, the quantity of which is source of constant amusement to the builder, electrician and plumber.