18th Nov 2012

The front wall has been completed up to the roof plate. A door space has been created which will lead from the master bedroom into the new en-suite  On the opposite side of this door is the boarding the builder installed back on 15th October.


The photos below also show the position of the loft access, between the new and old loft space. This will be directly above the new landing access between the new and old sections.


Eventually all the areas with the black plastic will be opened up to join the new extension with the existing house.


The exiting so-fits and fascias have been removed, ready for joining the new roof when it arrives.


The temporary satellite position is visible in the photo on the right, as you can see, there is no roof yet, so although we think it is high enough not to be blocked and need moving again, only time will tell.